Where is the second Nuclear Power Plant in Rajasthan being constructed?
Banswara
Assertion A: Rajasthan overtaken Gujarat as highest solar energy installed capacity. Reason R: Rajasthan endowed with hi
Both correct, R explains A
Mahi Banswara Nuclear Project capacity: ~2800 MW
2800 MW
Match power plants with capacity
a-I,b-III,c-II,d-IV