Assertion A: Rajasthan overtaken Gujarat as highest solar energy installed capacity. Reason R: Rajasthan endowed with high solar radiation and large flat undeveloped land.
उत्तर: (A) Both correct, R explains A — Both correct and R explains A. Rajasthan's high solar radiation and vast flat land directly explain why it has become India's top solar energy state, overtaking Gujarat.
2025Level 2Medium
Assertion A: Rajasthan overtaken Gujarat as highest solar energy installed capacity. Reason R: Rajasthan endowed with high solar radiation and large flat undeveloped land.
संबंधित REET प्रश्न
राजस्थान में दूसरा परमाणु विद्युत संयंत्र कहाँ बनाया जा रहा है?
Rajasthan EnergySocial Studies
Mahi Banswara Nuclear Project capacity: ~2800 MW
Rajasthan EnergySocial Studies
NH 8 does not pass through which district? Udaipur
Rajasthan GeographySocial Studies
Assertion: Nakki Lake at Bundi (WRONG - it's at Mt Abu). Reason: Sacred for Garasia tribe.
Rajasthan LakesSocial Studies
Correct: (b) Adipose tissue removes triglycerides (c) Gluconeogenesis from non-carbs (d) Cyanide blo...
BiochemistryScience
Rajasthan Energy के सभी प्रश्न देखें
विषय देखें →